SureShear Pipe Shearing Demonstration – Dec. 06, 2018
Shear demonstration with Cameron® subsea BOP (pictured top left and bottom right). Five accumulators managed by SureShear controller (pictured top right).
SureShear Pipe Shearing Demonstration – Feb. 18, 2016
Shear demonstration with surface BOP (top right and inset image of shear). Two accumulators managed by SureShear controller (top left).
Services
Latest News
- Bastion SMAS Interns Attend RS-25 Engine Test at StennisDecember 7, 2023 - 5:10 pm
- JPL Employees Support Fellow Military VeteransDecember 4, 2023 - 2:42 pm
- Bastion Employees Receive NASA MSFC Honor AwardNovember 13, 2023 - 5:27 pm
- NASA and Bastion: A History of CollaborationNovember 6, 2023 - 3:18 pm
Careers with Bastion
Learn more about job opportunities with Bastion.
Bastion Corporate Office
17625 El Camino Real, Suite 330
Houston, TX 77058
voice: (281) 283-9330
fax: (281) 283-9333
www.BastionTechnologies.com