SureShear Pipe Shearing Demonstration – Dec. 06, 2018
Shear demonstration with Cameron® subsea BOP (pictured top left and bottom right). Five accumulators managed by SureShear controller (pictured top right).
SureShear Pipe Shearing Demonstration – Feb. 18, 2016
Shear demonstration with surface BOP (top right and inset image of shear). Two accumulators managed by SureShear controller (top left).
Services
Latest News
Bastion Instrumental Part of Test Operations In Preparation for the Artemis II MissionFebruary 14, 2023 - 10:08 pm
Bastion Technologies Receives MSFC Small Business Prime Contractor Excellence AwardOctober 25, 2022 - 9:39 pm
Bastion Employee Recognized for JSC Exceptional Software AwardOctober 13, 2022 - 3:29 pm
Bastion Employees Certified as NASA CRM TrainersOctober 13, 2022 - 3:16 pm
Careers with Bastion
Learn more about job opportunities with Bastion.
Bastion Corporate Office
17625 El Camino Real, Suite 330
Houston, TX 77058
voice: (281) 283-9330
fax: (281) 283-9333
www.BastionTechnologies.com